Case studies

Projects where the result and the evidence both mattered

We work for organisations whose software has to run in the field, connect to other systems and pass an audit. Below are selected projects: custom-built solutions and our own products.

The EnGo application on a laptop and phone

60%

shorter reporting time

Custom software · Energy

EnGo: Digitising inspections of energy infrastructure

A mobile and web application with maps and full offline mode replaced paper-based walking inspections of high-voltage lines.

  • Java
  • Spring
  • Hibernate
  • Angular
  • Delivery: 3 months
Case study
The EnsysTM platform on a laptop and phone

50%

shorter route planning time

Custom software · Energy

EnsysTM: Planning and delivering the construction of high-voltage lines

A web platform with map, configuration and statistics modules brought order to investments previously run on paper and in spreadsheets.

  • Java
  • Spring
  • Hibernate
  • Angular
  • Delivery: 2 months
Case study
Map with observations in the HSEQ application

HSEQ

Custom software · Industry / Energy

HSEQ: Digital management of HSEQ processes

A progressive web application (PWA) for Health, Safety, Environment and Quality processes: inspections, observations and tasks, online and offline.

  • Java
  • Spring
  • Hibernate
  • Angular
  • Delivery: 3 months
Case study
sara.next on a laptop and phone

50%

shorter access review

Product · Power and automation

sara.next: Central access management for SOX requirements

A global leader in power and automation technology replaced scattered manual reviews with one platform and a register built for audit.

  • Java
  • Angular
  • TypeScript
  • Microsoft Azure
  • Delivery: 4–6 weeks
Case study
whiblo on a laptop and phone

70%

more reports thanks to anonymity

Product · Compliance

whiblo: A secure reporting channel for whistleblowers

A web and mobile application for confidential reporting of irregularities, aligned with the Whistleblower Protection Directive and launched within days.

  • Java
  • Angular
  • TypeScript
  • Microsoft Azure
  • Delivery: 3–5 days
Case study

A practitioner’s view

What these projects have in common

The industries differ, but the starting point repeats: a process run on paper, in spreadsheets or by e-mail, and an inspection that demands evidence.

01

Data captured where it arises

In EnGo and HSEQ information enters the system in the field, even without coverage. Retyping notes back at the office disappears, and with it delays and mistakes.

02

Validation instead of correction

The system checks data at the moment of entry. In EnGo and whiblo this reduced human errors before they reached a report or a case.

03

Change history as a requirement

In EnsysTM and sara.next full event logging and a central register were a condition of meeting the operator’s requirements and SOX controls, not an extra.

Industries

Where an error in data has consequences

We have the most experience in sectors where processes are controlled from outside: by a system operator, a regulator, an auditor or a certification body.

In energy we build tools for planning investments and inspecting infrastructure. In industry and international groups we bring order to system access. In the biofuel supply chain we support reporting to the EU database, and in companies and public offices we launch reporting channels.

Energy and renewables

Line planning, grid inspections, renewable fuel reporting.

Industry and manufacturing

Access management, quality and occupational safety inspections.

Finance

Access management and reporting channels in regulated organisations.

Public sector

Reporting channels and permission management in public offices.

Facing a similar challenge?

Tell us about the process you want to put in order. We will show how we solved a similar problem and where it makes sense to start.